ERDI-CMU Campus BESS

ERDI-CMU, the energy research institute at Chiang Mai University, wanted on-site storage that could shave its demand peaks and back up its office — and double as a working reference for its own research.

ERDI-CMU Campus BESS
Outcomes

At a glance

ERDI — Chiang Mai University2023
50 kW
BESS power
45 kWh
BESS energy
Oct 2023
COD
The challenge

What the client needed

ERDI-CMU, the energy research institute at Chiang Mai University, wanted on-site storage that could shave its demand peaks and back up its office — and double as a working reference for its own research.

Our solution

What we delivered

For ERDI-CMU and CCT, PEC installed a 50 kW / 45 kWh indoor BESS configured for peak shaving and emergency backup.

Why PEC

Why this project chose PEC

A research institute needs a system it can rely on and also study, with the documentation to match. PEC delivered the indoor BESS with a full set of project documents.

Outcome

What happened in production

The BESS shaves the institute's demand peaks and remains available for emergency backup; it was commissioned in October 2023.