Power Generation

EGCO Sai Yai 1 Net-Zero BESS

At its Sai Yai 1 renewable plant, EGCO wanted to pair battery storage with PV so on-site generation and load could be balanced through the day — the basis for running the site toward net zero.

EGCO Sai Yai 1 Net-Zero BESS
Outcomes

At a glance

EGCO Group2021
30 kW
BESS power
64.8 kWh
BESS energy
Net-zero
Application
Dec 2021
COD
The challenge

What the client needed

At its Sai Yai 1 renewable plant, EGCO wanted to pair battery storage with PV so on-site generation and load could be balanced through the day — the basis for running the site toward net zero.

Our solution

What we delivered

PEC installed a 30 kW / 64.8 kWh Li-ion BESS that works with the plant's PV to balance generation against load. The project runs under an MOU between PEC and ITE for Solarco.

Why PEC

Why this project chose PEC

Balancing generation against load in real time is a controls problem before it is a hardware one. PEC's experience tying BESS to PV is what it brought to Sai Yai 1.

Outcome

What happened in production

The system coordinates storage and PV at the plant as a working net-zero demonstration; it was commissioned in December 2021.