At its Sai Yai 1 renewable plant, EGCO wanted to pair battery storage with PV so on-site generation and load could be balanced through the day — the basis for running the site toward net zero.
Power Generation
EGCO Sai Yai 1 Net-Zero BESS
At its Sai Yai 1 renewable plant, EGCO wanted to pair battery storage with PV so on-site generation and load could be balanced through the day — the basis for running the site toward net zero.

Outcomes
At a glance
EGCO Group2021
30 kW
BESS power
64.8 kWh
BESS energy
Net-zero
Application
Dec 2021
COD
The challenge
What the client needed
Our solution
What we delivered
PEC installed a 30 kW / 64.8 kWh Li-ion BESS that works with the plant's PV to balance generation against load. The project runs under an MOU between PEC and ITE for Solarco.
Why PEC
Why this project chose PEC
Balancing generation against load in real time is a controls problem before it is a hardware one. PEC's experience tying BESS to PV is what it brought to Sai Yai 1.
Outcome
What happened in production
The system coordinates storage and PV at the plant as a working net-zero demonstration; it was commissioned in December 2021.